CEDB Hydropower Development Company Limited (CHDC), a public limited company incorporated under the prevalent laws of Nepal on Mangsir 15, 2066 (November 30, 2009). CEDB Hydropower Development Company Limited (CHDC) was founded by the then Clean Energy Development Bank to provide equity investment for hydropower projects to meet energy needs of the nation. CHDC is currently mandated to invest in and develop Hydropower Projects. It has got three hydropower projects in operation and four projects at construction and development stages.
Projects Under Development/ Construction
1. Tallo Khare Khola Hydropower Project (11 MW) (Dolakha)
2. Dordi-1 Hydro Electric Project (12 MW) (Lamjung)
3. Rukum Gad Hydropower Project (5 MW) (Rukum)
4. Kasuwa Hydropower Project (45 MW) (Sankhwasabha)
Basic Job Information
Job Category | : | Research and Development |
Job Level | : | Mid Level |
No. of Vacancy/s | : | [ 1 ] |
Employment Type | : | Full Time |
Job Location | : | Kathmandu, Nepal |
Offered Salary | : | Negotiable |
Apply Before(Deadline) | : | May. 09, 2020 23:55 |
Job Specification
Education Level | : | Master |
Experience Required | : | More than or equals to 2 years |
Other Specification
- Must have MBA (International Business and Public Investment) /CA or Equivalent Degree
Job Description
- Identify foreign investors who match CHDC & Subsidiary’s criteria for investment in CHDC’s Project
How To Apply: